FG will attach a 10-year maintenance responsibility  to projects, contractors to bear repair costs within the period – Umahi

South East leaders

FG will attach a 10-year maintenance responsibility  to projects, contractors to bear repair costs within the period – Umahi

Oct 28, 2023

…Says comprehensive rehabilitation to begin Nov. 1 on Third Mainland Bridge

The Minister of Works, Mr. David Umahi, has warned that henceforth a 10-year maintenance responsibility would be attached to projects for contractors to bear repair costs within the period if the road failed.

Umahi said this on Saturday during an inspection of the under deck, lagoon sections of the Third Mainland Bridge and other bridges.

He noted that a comprehensive rehabilitation of the 11.8-kilometer Third Mainland Bridge in Lagos would begin on Nov. 1 for a period of three months.

The minister, a team of engineers, directors of the Federal Ministry of Works and journalists inspected the lagoon sections of the Third Mainland, Carter, Independence and Falomo Bridges.

Umahi also inspected the deteriorating Marina shoreline, the failing portions of the Five Cowries Bridge located in Zone Two Police Headquarters in Onikan, Ijora Bridge and Marina Bridge in Apapa.

He said the entire stretch of the Third Mainland Bridge would undergo total resurfacing with minimal discomfort to road users, and the repairs would be carried out by midnight during the weekend.

He said he carried out inspection of the top surface of the bridge on Friday before embarking on inspection of the Lagoon portions.

The minister explained that patching of various sections of the top surface of bridge had led to undulating surfacing, which was not healthy for its safety, hence the need to remove and relay the entire asphaltic covering.

“We are going to mill out the excess asphalt and retain only two millimetres,” he said.

The minister said the proposed maintenance of Third Mainland Bridge, which would last three months was the first phase meant to secure the integrity as well aesthetics of the upper deck components of the bridge.

He explained that the maintenance of the aesthetics would include replacement of the railings, installation of solar-powered lights and CCTV cameras for optimal security of the bridge.

The minister assured that the three-month maintenance work would be without discomfort to motorists, as it would take place only between midnight and 4.00 a.m. and during weekends.

He added that more than one contractor would be engaged due to the emergency nature of the work, which would end in Phase Four; that will entail the repairs of deflected slabs, bearings, piers and pile caps.

The minister lamented that most of the bridges were about 60 years old and had outlived thier design lifespan, hence the need for constant rehabilitation.

Umahi, who is a civil engineer, said the Marina Shoreline had deteriorated and was threatening the foundation of some parts of the Blue Rail Line, hence the need for urgent protection which had begun.

“Marina shoreline is gone,” he said.

He added that contractors who constructed roads that failed within two years risked jail term in line with global practices to curb shoddy constructions.

The Third Mainland Bridge was earlier closed for 24 hours repairs from midnight on Oct. 21 to midnight Oct. 22 for emergency resurfacing of some bad portions.